Preliminary Carpark & Stormwater Strategy – Heritage Site Upgrade

Alice Springs, Northern Territory

Structhaven completed a preliminary carpark and stormwater documentation package for the Women’s Museum of Australia & Old Gaol in Alice Springs, addressing recurrent surface-water ponding, rutting, degraded unsealed pavement conditions and constrained vehicle circulation within a heritage-sensitive site.

The scope integrated carpark geometry, accessible parking, pedestrian connectivity, vehicle movement, landscape interfaces and preliminary stormwater management, with indicative runoff vectors, collection points, drainage alignments and potential discharge pathways developed from available historical survey information and documented site conditions.

The documentation was prepared specifically to support authority consultation, funding review and subsequent civil design, while clearly separating preliminary design intent from detailed engineering requirements such as final grading, hydraulic capacity, pit configuration, invert levels and discharge infrastructure.

Preliminary carpark and stormwater concept plan for the Women’s Museum of Australia & Old Gaol in Alice Springs, showing proposed parking layout, vehicle circulation and site access.
Stormwater drainage concept for the Women’s Museum of Australia & Old Gaol, illustrating indicative runoff directions, collection points and potential discharge pathways across the existing carpark.
Existing site and proposed carpark documentation for the heritage-listed Women’s Museum of Australia & Old Gaol in Alice Springs, prepared for authority consultation and funding review.
Previous
Previous

Residential & Commercial Drafting

Next
Next

Mining & Industrial Infrastructure